Implications of the technical work file revision contemplated in supreme decree N.° 344-2018-Ef, law regulation N.° 30225, State contracting law

Authors

  • Hugo Sologuren Calmet Pontifical Catholic University of Peru image/svg+xml Author

DOI:

https://doi.org/10.18259/iet.2018007

Keywords:

Technical work file, additional benefits, period extensions, risks

Abstract

The author addresses the problem that is generated from the review of the technical work file by the contractor, in reference to the detection of errors in its formulation that could affect the execution of the contractually assumed activities, within the terms indicated in article 177 of the Regulations of the State Contracting Law, in addition to identifying the work and responsibility that the Entity must assume in relation to such context.

References

Contraloría General de la República de Chile. (2009).Dictamen N.º 4.606.Recuperado de https://contraloria.cl/pdfbuscador/dictamenes/004606N09/html.

Molina, C. & Ríos, V. (2016). Derecho de la construcción. Santiago de Chile: O’Print Impresores S. A.

Downloads

Published

2018-12-21

Issue

Section

Artículos